DISCUSS YOUR SITUATION →
← Services/Physical site hardening

SERVICE LINE 06

Physical site hardening

Concentration is efficient and fragile. We survey the sites that carry critical function and address the four things that decide whether they keep running: power, fuel, access and shelter — then reduce what any single site can take away from you.

SURVEY
PER SITE
DOMAINS
POWER / FUEL / ACCESS / SHELTER
AUTONOMY TARGET
SET WITH CLIENT
DISPERSAL
CRITICAL FUNCTION ONLY
WORKS
SPECIFIED, NOT SUPPLIED
01

ILLUSTRATIVE
PERIMETERACCESSPOWER & FUELSHELTERCRITICAL FUNCTIONSPLIT ACROSS TWO PLACESEACH LAYER BUYS TIMEFOR THE LAYER INSIDE ITAUTONOMYHOURS THE SITE RUNS ALONETARGET SET WITH CLIENTDISRUPTION REACHING THE SITEA LAYER OF PROTECTIONSPECIFIED, NOT SUPPLIED
02

4 STAGES
  1. Autonomy survey

    How long each site runs unsupported, measured rather than quoted from the generator's rating plate.

  2. Fuel and water

    Reserve, rotation, resupply contracts and the route the tanker actually takes.

  3. Access and shelter

    Control under degraded conditions, muster points, and provision for staff who cannot leave.

  4. Dispersal

    Which functions must stop being in one building, and what it costs to move them.

WHAT YOU LEAVE WITH

  1. 01Per-site autonomy measurement and gap list
  2. 02Prioritised hardening works specification
  3. 03Fuel, water and resupply contingency contracts
  4. 04Dispersal plan for concentrated critical function

THE QUESTION WE OPEN WITH

ANSWER IT OUT LOUD
NEXTSupply chain contingencyMapping to tier three, then pre-contracting the alternatives.

Written, tested,and left readyto execute

Not advice and not a document. The plan is installed, rehearsed on shift, and handed over in a state it can be run in.

DISCUSS YOUR SITUATION→