SERVICE LINE 06
Physical site hardening
Concentration is efficient and fragile. We survey the sites that carry critical function and address the four things that decide whether they keep running: power, fuel, access and shelter — then reduce what any single site can take away from you.
- SURVEY
- PER SITE
- DOMAINS
- POWER / FUEL / ACCESS / SHELTER
- AUTONOMY TARGET
- SET WITH CLIENT
- DISPERSAL
- CRITICAL FUNCTION ONLY
- WORKS
- SPECIFIED, NOT SUPPLIED
Autonomy survey
How long each site runs unsupported, measured rather than quoted from the generator's rating plate.
Fuel and water
Reserve, rotation, resupply contracts and the route the tanker actually takes.
Access and shelter
Control under degraded conditions, muster points, and provision for staff who cannot leave.
Dispersal
Which functions must stop being in one building, and what it costs to move them.
WHAT YOU LEAVE WITH
- 01Per-site autonomy measurement and gap list
- 02Prioritised hardening works specification
- 03Fuel, water and resupply contingency contracts
- 04Dispersal plan for concentrated critical function
THE QUESTION WE OPEN WITH
Written, tested,and left readyto execute
Not advice and not a document. The plan is installed, rehearsed on shift, and handed over in a state it can be run in.