DISCUSS YOUR SITUATION →
← Advisory/Engagement

What happens if you engage KOLOSAL7. The endpoint is not an approved document. It is a business or organisation able to act when the document's assumptions stop being true.

Assessment and analysis

What you rely on, who controls it, and how quickly it can be taken away.

WHAT IT PRODUCES

  • 01Critical operations and assets
  • 02The seven components and the links between them
  • 03Suppliers and stakeholders
  • 04Existing plans
01

  1. 01Assessment and analysis

    What you rely on, who controls it, and how quickly it can be taken away.

    GATE 1A written position on exposure the board can disagree with in specifics rather than in general.

  2. 02Development

    Business recovery plans, tailored to the business: levels of authority, delegation, degraded-mode runbooks.

    GATE 2Plans the people who will run them agree they can run.

  3. 03Implementation and testing

    Full or partial implementation, then testing.

    GATE 3Every failure in the test named and traced to its cause.

  4. 04Correction and finalisation

    Plans corrected by the results of the tests, and the model finalised.

    GATE 4Nothing that failed in the test is left as it was.

  5. 05Keeping it current

    Ongoing support: once a quarter, further analysis and a review of changes in the business.

    KEEPING IT CURRENTThe model stays current as the business changes.

TIMING TAILORED TO SCOPE

Assessment and analysis

What you rely on, who controls it, and how quickly it can be taken away.

  • Critical operations, assets and critical personnel
  • The seven components and the interaction chains between them
  • Suppliers and stakeholders
  • Existing plans, read against a collapse that matches none of their scenarios
  • Sites, where the engagement requires it
GATE 01CLOSEDCLEARED

A written position on exposure the board can disagree with in specifics rather than in general.

Development

Business recovery plans, tailored to the business — not one-size-fits-all.

  • Business recovery plans for the specific business, site and geography
  • Levels of authority, and delegation three structural levels down
  • Degraded-mode runbooks
  • Work with suppliers and stakeholders
GATE 02CLOSEDCLEARED

Plans the people who will run them agree they can run.

Implementation and testing

Full or partial implementation, then testing.

  • Protocols put in place in the business or organisation
  • People trained
  • Exercises and tests with the real people and real authority
GATE 03CLOSEDCLEARED

Every failure in the test named and traced to its cause.

Correction and finalisation

Plans corrected by the results of the tests, and the model finalised.

  • Everything the tests broke, rewritten
  • The model finalised and handed over
GATE 04CLOSEDCLEARED

Nothing that failed in the test is left as it was.

Keeping it current

Ongoing support: once a quarter, further analysis and a review of changes in the business.

  • Quarterly analysis
  • Changes in the business reviewed
  • Plans and model kept current
GATE 05CLOSEDCLEARED

The model stays current as the business changes.

02

ACCESS

To the people who run critical operations, at board, crisis-cell and shift level.

DOCUMENTS

Existing plans, contracts and procedures — whatever exists, in whatever state.

DECISIONS

Time from the people who hold authority, at the points where decisions are needed.

SITES

Access to the sites that perform critical functions, where the engagement requires it.

03

  • Protocols and command structures implemented in the business or organisation
  • Decision thresholds and delegated authority, signed
  • Runbooks that work in degraded mode, on paper where needed
  • People who have rehearsed what they will do
  • A tested record of what failed and how it was corrected
  • A review and retest schedule that keeps it current
04

A

Tailored, never one-size-fits-all

The plan and its implementation are fitted to the specific business, its needs and tasks, the specific site and geography.

B

Key infrastructure elements fail simultaneously

A large-scale collapse never matches any of the scenarios planned in advance. The design has to assume it.

C

Levels of authority, delegated in advance

Levels of authority are set and delegation reaches three structural levels down before anyone needs them.

D

Real readiness, not papers

Real protocols, real actions, implementation — not signed-off papers sitting in a drawer.

E

Beyond the business itself

The work extends to suppliers and stakeholders, because the business depends on whether they can keep delivering.

F

Tested, then kept current

Plans are tested, corrected by the results, finalised, and kept current as the business changes.

05

  1. Direct work with a senior adviser

    The core work is carried out directly by a senior adviser, who is accountable for the findings, recommendations and quality of the work from start to finish.

  2. Grounded in operational reality

    We start from how the business or organisation actually runs — its decisions, people, systems, interaction chains and constraints — rather than from an abstract model.

  3. Usable in degraded conditions

    Critical decisions and instructions must stay accessible and executable when some of the usual systems, communications or resources are unavailable.

  4. Clear findings

    Findings are stated directly and specifically, tied to the decision, process or dependency that needs strengthening.

06

Where does an engagement start?
With assessment: how your critical operations actually run, what they depend on across the seven critical components, and where they will fail. Everything later depends on getting that right.
Do we need every stage?
No. Work can be scoped to a single service line or phase. The one sequencing rule is that assessment comes first, because every later decision depends on it.
How is the work priced?
Per engagement, not per day or per head, and only once the scope is clear from the first conversation.
Can you work with our existing plans?
Yes. The usual starting point is to test them against a severe but credible scenario. Sometimes the right conclusion is that a plan is sound and needs testing rather than rewriting, and we will say so.
Will this satisfy our regulator?
The work can be mapped to the regulatory instruments that apply to you. Meeting a requirement is an outcome of the work rather than its purpose.
Do you only advise, or do you implement?
Both. Advice that stays in a document is the problem this work exists to solve. Protocols, authority, runbooks and operating changes are implemented with your teams, tested under pressure and kept current.
Will the work happen at our sites?
Where the engagement requires it. The work is done at the level of the actual operating environment — sites, shifts, suppliers — and may combine remote work, workshops, site inspections and exercises.
Who does the work?
KOLOSAL7 is led by its founder, who personally carries out and is accountable for the core work.
Is this relevant outside Ukraine?
Yes. The operating links exposed by sustained disruption in Ukraine exist in any business or organisation that relies on infrastructure it does not control. For European businesses and organisations, the work is to find them before they are tested in reality.

Real protocols.Real actions.Real readiness.

Not signed-off papers sitting in a drawer, but implementation, step by step, for the situations you will actually face.