A traditional plan is prepared for one event and assumes everything around it keeps working. We build business recovery plans around the business or organisation as one system — the seven components and the interaction chains between them — down to shift-level instructions. Then they are implemented, tested and kept current, not filed.

DEPTH
GROUP TO SHIFT LEVEL
BASELINE
WORST CREDIBLE SCENARIO
OUTPUT FORM
PAPER + DIGITAL
RE-TEST
SCHEDULED AND AS THE BUSINESS CHANGES
01

ILLUSTRATIVE
CAPABILITY RETAINED100 %60 %30 %0 %TIME →WHAT PLANS ASSUME:A SMOOTH DECLINEWHAT HAPPENS: SUDDEN DROPSEACH LEVEL NEEDS ITS OWN INSTRUCTIONLOSS 1LOSS 2LOSS 3NORMAL OPERATIONEverythingavailableRUNBOOK ASome functionsstop, the restcontinueRUNBOOK BCritical functionsonlyRUNBOOK CBy hand, onpaperWRITTEN FOR THE PERSON ON SHIFT
02

4 STAGES
  1. Seven-component teardown

    Every input your operation cannot run without, across energy, communications, IT, payments, life support and people — named, owned, and traced through the links between them.

  2. Failure sequence

    How your business or organisation degrades when several components fail simultaneously, written out step by step rather than assumed to be graceful.

  3. Degraded-mode runbooks

    What each function does when partly degraded, heavily degraded, and with nothing. Written for the person on shift, not the person on the board.

  4. Paper discipline

    Physical copies, revision-controlled, held at the sites that need them, checked on a schedule.

03

ASSESSED → DESIGNED → IMPLEMENTED → TESTED → MAINTAINED
WHERE IT ACTS IN THE MODEL
  • Energy
  • Communications
  • IT systems
  • Payments
  • Life support
  • People
  • Business operations
  1. ASSESSED

    Critical operations across all seven components and the links between them

  2. DESIGNED

    Business recovery plans: degraded-mode operation and restoration order for each critical function

  3. IMPLEMENTED

    Runbooks, owners and paper copies placed where they will be used

  4. TESTED

    Against several simultaneous failures, not one scenario at a time

  5. MAINTAINED

    Reviewed as sites, suppliers and conditions change

WHAT YOU LEAVE WITH

  1. 01Register of interaction chains, with single points of failure ranked
  2. 02Degraded-mode runbook set, per function, per site
  3. 03Restoration sequence with named owners
  4. 04Paper distribution and revision schedule
  5. 05Protocols implemented in the business or organisation and tested under pressure

THE QUESTION WE OPEN WITH

ANSWER IT OUT LOUD
NEXTCrisis protocol designWho decides, on what threshold, with what authority, in writing.

Real protocols.Real actions.Real readiness.

Not signed-off papers sitting in a drawer, but implementation, step by step, for the situations you will actually face.