SERVICE LINE 01
Continuity & resilience planning
Your existing plan was written to satisfy an auditor. We rewrite it to survive an adversary. The work starts at the worst credible scenario and reasons backwards to the shift-level instruction, rather than starting at last year's document and adding a paragraph.
- DEPTH
- GROUP TO SHIFT LEVEL
- BASELINE
- WORST CREDIBLE SCENARIO
- OUTPUT FORM
- PAPER + DIGITAL
- RE-TEST
- ANNUAL, INDEPENDENT
Dependency teardown
Every input your operation cannot run without, named, owned and rated for how quickly it can be taken away.
Failure ladder
The sequence in which your organisation degrades, written out step by step rather than assumed to be graceful.
Degraded-mode runbooks
What each function does at 60%, at 30%, and with nothing. Written for the person on shift, not the person on the board.
Paper discipline
Physical copies, revision-controlled, held at the sites that need them, checked on a schedule.
WHAT YOU LEAVE WITH
- 01Dependency register with single points of failure ranked
- 02Degraded-mode runbook set, per function, per site
- 03Restoration sequence with named owners
- 04Paper distribution and revision schedule
THE QUESTION WE OPEN WITH
Written, tested,and left readyto execute
Not advice and not a document. The plan is installed, rehearsed on shift, and handed over in a state it can be run in.