SERVICE LINE 10 — FIG_110
Post-event recovery
Recovery is planned last and matters longest. The order of restart, the condition on which staff return, and the quality of the record you kept while it was happening decide what the event finally costs you.
DURATION6–10 WEEKS
RESTARTSEQUENCED, DEPENDENCY-LED
RECORDFORENSIC, CONTEMPORANEOUS
CLAIMSEVIDENCE PACK PRE-DESIGNED
WORKFORCERETURN CONDITIONS WRITTEN
CLASSIFICATIONCOMMERCIAL IN CONFIDENCE
01RESTART, IN ORDERFIG_I / 18 DAYS
02METHOD4 STAGES
01Restart sequencingWhich function comes back first, and what it depends on. Restarting in the wrong order costs more than waiting.
02Workforce returnThe conditions under which staff come back, written before anyone has to decide it under pressure.
03Forensic recordThe log discipline that makes an insurance claim and a regulatory account possible afterwards.
04Findings loopWhat the event taught, converted into document changes with owners and dates, not into a slide.
03WHAT YOU LEAVE WITH
01Dependency-led restart sequence
02Workforce return conditions and communications
03Claims evidence pack specification
04Post-event findings register with owners
04THE QUESTION WE OPEN WITH
ANSWER IT OUT LOUDIf the event ended tomorrow, could you evidence, hour by hour, what you did and why?CLIENT ANSWER — REDACTED
The plan iswritten beforeit is needed
Initial briefings are held under NDA, at your site or ours. Two hours. No deck.