SERVICE LINE 06 — FIG_106
Physical site hardening
Concentration is efficient and fragile. We survey the sites that carry critical function and address the four things that decide whether they keep running: power, fuel, access and shelter — then reduce what any single site can take away from you.
SURVEYPER SITE, ON FOOT
DOMAINSPOWER / FUEL / ACCESS / SHELTER
AUTONOMY TARGETSET WITH CLIENT
DISPERSALCRITICAL FUNCTION ONLY
WORKSSPECIFIED, NOT SUPPLIED
CLASSIFICATIONCOMMERCIAL IN CONFIDENCE
01THE SITE, IN PLANFIG_E / AUTONOMY RINGS
02METHOD4 STAGES
01Autonomy surveyHow long each site runs unsupported, measured rather than quoted from the generator's rating plate.
02Fuel and waterReserve, rotation, resupply contracts and the route the tanker actually takes.
03Access and shelterControl under degraded conditions, muster points, and provision for staff who cannot leave.
04DispersalWhich functions must stop being in one building, and what it costs to move them.
03WHAT YOU LEAVE WITH
01Per-site autonomy measurement and gap list
02Prioritised hardening works specification
03Fuel, water and resupply contingency contracts
04Dispersal plan for concentrated critical function
04THE QUESTION WE OPEN WITH
ANSWER IT OUT LOUDCLIENT ANSWER — REDACTED
The plan iswritten beforeit is needed
Initial briefings are held under NDA, at your site or ours. Two hours. No deck.